Overview
Eton Systems overview.
Eton Systems overview.
Eton Systems installation at Wendre making quilts.
Eton Systems for mattress manufacturing.
Manufacturing of quilts, mattresses and seats.
Himatsingka Linens is a silk fabric exporter since 1990 producing bed sets. With the Eton system they were able to increase production with at least 30-35%.
Zorlu Hometeks is a company with over 55 years of history and 900 employees, producing flat & fitted sheets. With the Eton system they were able to increase production with at least 55%.
Cardon SA, France is a privately owned company producing curtains, sheets, duvet bags & quilted bedspreads. With the Eton system they were able to increase production with at least 10% and the return on investment was approximately 2 years.
ACV Products, India is a privately owned company producing blankets. With the Eton system they were able to increase production with up to 40% and the return on investment was less than 12 months.
Eke Tekstil, Turkey, is a privately owned company producing bathrobes. With the Eton system they were able to increase production with up to 43% and the return on investment was less than 18 months.
ACV Products, India is a privately owned company producing blankets. With the Eton system they were able to increase production with up to 40% and the return on investment was less than 12 months.
Company name: ACV Products, Theni (TN), India.
Company profile: Private company.
Type of production: Blankets.
Order size: 1,000- 5,000 pieces.
Previous production system: Manual.
Eton System installed: 2008.
How many stations installed: 30.
Production Data |
Without Eton |
With Eton |
| Capacity units/shift/oper. | 250 | 350 |
| Production increase: | – | 40% |
| Throughput-time: | 2 days | Less than 1 day |
| Return on investment: | – | Less than 12 months |
| Operations made by Eton: | – | Complete |
Reduced work in process, fewer soiled garments, better quality control, larger customer base due to shorter lead times on orders. Better space utilization.
To reduce direct labor costs and reduce work-in- process times. Better visibility. Quick Changeover.